The Attention Of Operation Rubber Press Machine

  1. The operating pressure shall not exceed the rated pressure.
  2. The minimum mold size shall not be less than the diameter of the piston. The mold should be placed in the middle of the hot plate; The working hydraulic pressure should be adjusted according to the size of the mold and vulcanizing time.
  3. Turn off the main power supply when stopping use.
  4. Keep the column nuts tight during operation, and check periodically whether they are loose.
  5. When the machine is run without mold, a 60mm thick pad must be placed in the plate.
  6. The main machine and control box should be reliably grounded
  7. Each contact must be clamped, and check regularly whether there is any loosening.
  8. Keep electrical components clean. Do not impact or knock the machine.
  9. If any fault is found, stop the machine for maintenance immediately.

Leave a Reply

Your email address will not be published. Required fields are marked *